Engineered With Layton
Improving life's quality within our environment one project at a time

Electrical Services

    • Alternate Power Systems for Emergency & Standby Uses
    • Critical & Clean Power Distribution Systems
    • Electrical Grounding Systems to Facilitate Power Quality & Lightning Protection
    • Fire Alarm & Voice Evacuation Systems
    • Primary Distribution Systems for Campus & Community Master Plans
    • In Building Power Distribution
    • Lighting & Control Systems

     

    • Metering Systems for Measurement, Verification & Control of Loads
    • Renewable Power Systems – PV, Wind, Fuel Cell, Microturbine
    • Uninterruptible Power Supply Systems
    • Telecommunications Systems
    • Security & Access Control Systems
    • Low Energy Systems in Support of the Facility Usage

     

    Lock Out Tag Out Study, Report and Training

    Engineered With Layton (EWL) was the Prime Contractor managing the entire engineering team’s study of the George E. Wahlen Medical Center campus Lock Out Tag Out (LOTO) procedures in Salt Lake City, UT. 

    Critical Systems Study & Design

    Engineered With Layton (EWL) was the Prime Contractor managing the Study and Design to correct loading deficiencies to the essential emergency electrical distribution systems in Building B.01. 

    Primary Electrical Radial Replacement

    Engineered With Layton (EWL) was the Prime Contractor managing the entire engineering team’s design for the fifth phase of the Substation Upgrade and Campus Wide Redundant Loop Distribution Master Plan.